Sea Monarch renovation in progress

Active Renovation

A Building Transformed

Sea Monarch is undergoing a complete, top-to-bottom multi-million dollar renovation. Every system. Every surface. Every detail — rebuilt for the next generation of oceanfront living.

What We're Building

This isn't cosmetic. Sea Monarch's renovation addresses the building from the ground up — mechanical systems, structural integrity, common areas, and common area finishes — all executed while owners enjoy everything South Florida has to offer.

The result is a building that looks, feels, and functions like new construction, at a fraction of the cost per square foot.

9

Active Renovation Scopes

100%

Permitted & Documented

Q4 2028

Estimated Project Completion

Licensed

Florida Contractors

Renovation Scopes

Every System. Every Surface.

01

Emergency Life Safety Systems

In Progress

Full replacement of the building's emergency life safety infrastructure — fire suppression, alarm systems, emergency lighting, and egress signage — brought to current Florida code.

  • Fire suppression system replacement
  • Alarm panel and detector upgrades
  • Emergency lighting throughout all floors
  • Egress signage and exit path compliance
02

Mold & Asbestos Abatement

Completed

Professional remediation of mold and asbestos throughout the building envelope. All work performed by licensed contractors with full documentation and third-party clearance testing.

  • Licensed mold remediation contractors
  • Asbestos removal and encapsulation
  • Air quality testing and clearance certification
  • Full documentation for buyer disclosure
03

Hallway & Common Area Redesign

Upcoming

Complete redesign of all interior corridors and common areas. New flooring, lighting, paint, and wayfinding — creating a hotel-quality arrival experience on every floor.

  • New carpet throughout
  • Recessed LED lighting on all floors
  • Fresh paint and updated wall sconces
  • Modernized elevator lobbies and wayfinding
04

Smart Security & Access

In Progress

Building-wide smart access control powered by ButterflyMX video intercom and a full HD camera network covering all entry points, parking, and common areas.

  • ButterflyMX video intercom at all entries
  • HD camera coverage — lobby, parking, pool, catwalks
  • Mobile app access for residents and guests
  • 24/7 recorded surveillance with cloud backup
05

Catwalk & Exterior Finishes

In Progress

Structural repair and cosmetic refinishing of all exterior catwalks, railings, and building facade elements — restoring the building's oceanfront presence.

  • Catwalk structural inspection and repair
  • Railing replacement to current code
  • Exterior paint and sealant application
  • Balcony and facade waterproofing
06

Storage Locker Renovation

In Progress

Complete renovation of all three building storage locker rooms — fresh paint, new floor finishes, custom metal lockers, and updated lighting throughout, scheduled for completion in Q4 2026.

  • Full renovation of all three storage locker rooms
  • New paint and floor finish throughout
  • Custom metal locker installation
  • New lighting in all storage areas
07

DOAS & Cooling Tower Replacement

Upcoming

Full replacement of the building's Dedicated Outdoor Air System (DOAS) and cooling tower, along with new HVAC shafts integrated with ELSS smoke control dampers — delivering modern air quality, energy efficiency, and life safety compliance throughout the building.

  • Dedicated Outdoor Air System (DOAS) replacement
  • Cooling tower full replacement
  • New HVAC shaft installation building-wide
  • ELSS smoke control damper integration
  • Improved indoor air quality and energy efficiency
08

Elevator Replacement

Planned

Complete replacement of all four building elevators — one freight elevator and three passenger elevators — with modern, code-compliant systems for improved reliability, capacity, and resident experience.

  • 3 passenger elevator full replacements
  • 1 freight elevator full replacement
  • Modern cab finishes and controls
  • Code-compliant safety systems and inspections
  • Reduced wait times and improved reliability
09

Electrical Capacity Upgrade

Planned

A comprehensive electrical infrastructure upgrade designed to support the building's new mechanical systems and future resident demands. This scope ensures Sea Monarch is fully equipped for the next generation of oceanfront living — including EV charging readiness throughout the property.

  • Increased service capacity to support new DOAS and cooling tower loads
  • Dedicated electrical circuits for elevator replacement systems
  • EV charging infrastructure — conduit and panel capacity for future EV stations
  • Building-wide panel and distribution upgrades
  • Future-proofed capacity for evolving resident electrical demands

Schedule

Renovation Timeline

Work is active across multiple phases simultaneously.

01

Emergency Life Safety Systems (ELSS)

Q3 2026

Active
02

Mold & Asbestos Abatement

Q3 2026

Completed
03

Hallways & Common Areas

Q3–Q4 2026

Active
04

Storage Lockers

Q3–Q4 2026

Active
05

Security Systems

Q4 2026

Upcoming
06

Catwalk & Exterior

Q4 2026

Upcoming
07

DOAS & Cooling Tower

Q1 2027

Upcoming
08

Electrical Capacity Upgrade

Q2 2027

Planned
09

Elevator Replacement

Q2 2027–Q4 2028

Planned

Buyer Confidence

Our Commitment to Transparency

Every renovation scope item is documented, permitted, and available for buyer review. We believe informed buyers make confident buyers — and confident buyers become happy owners.

Permitted Work

All renovation work is fully permitted with Broward County.

Licensed Contractors

Every trade is performed by licensed, insured Florida contractors.

Buyer Documentation

Full renovation documentation available upon request during due diligence.

See the Progress Yourself

Ask your Realtor to Schedule a walkthrough and see the renovation firsthand. We welcome buyers at any stage of the process.